並列タイトル等Analysis of BWR long-term station blackout accident using TRAC-BF1
一般注記A long-term station blackout accident of a BWR is analysed using TRAC-BF1, and the calculated results are compared with the observed data at the unit 2 reactor of the Fukushima Daiichi nuclear power plant. The RCIC is assumed to be actuated, and the reactor pressure and the liquid level in the core are found to be stable and the dry well pressure increases gradually. The effects of leakage and heat release from the containment are discussed. The reactor pressure increases to the SRV set point and the liquid level and the dry well pressure decrease after the termination of RCIC. The calculated results are in good agreement with the observed data, and the thermal–hydraulic transient of unit 2 reactor is shown to be simulated well.
source:https://www.sciencedirect.com/science/article/pii/S030645491200196X?via%3Dihub
一次資料へのリンクURLhttps://u-fukui.repo.nii.ac.jp/?action=repository_action_common_download&item_id=29362&item_no=1&attribute_id=22&file_no=1
関連情報(DOI)10.1016/j.anucene.2012.05.028
連携機関・データベース国立情報学研究所 : 学術機関リポジトリデータベース(IRDB)(機関リポジトリ)