並列タイトル等Operating Experiences and Present Activities of JOYO
一般注記The preliminary design of experimental fast reactor JOYO was started in 1965. After thid design, three steps of conceptual designs are carried out, and main parameters were fixed during these steps. This paper describes the operatin experiences which contain functional test beore criticality, initial criticality and low power testing, power ascension tests to 50 MWt operation, power ascension tests to 75 MWt and 75 MWt operation.