本文へ移動
電子書籍・電子雑誌

Proceedings of International Symposium on Scheduling

国立国会図書館永続的識別子
info:ndljp/pid/10356186
資料種別
電子書籍・電子雑誌
著者
-
出版者
日本機械学会
出版年
-
資料形態
デジタル
ページ数・大きさ等
-
NDC
-
すべて見る

巻号一覧

全6件

Proceedings of International Symposium on Scheduling 2013
刊行2013-07-18
インターネットで読める国立国会図書館
目次COVER Copyright Information Proceedings of International Symposium on Scheduling 2013(Title Page) Preface 1 Preface 2 Welcome Organization of International Symposium on Scheduling 2013 Workforce Scheduling : Models, Methods and Future Challenges Disassembly : A Comprehensive Overview Development of Dynamic Exchange Dissassembl Order Algorithm for the Purpose of Fast Automatic Generation of Assembly Animation and 3D Work Instruction Sheets(Invited Talk) Cyclic re-entrant flow shop scheduling problem : approach from mathematical programming(Invited Tutorial) ISS2013 Program at a Glance CONTENTS 1A1 OEE MEASUREMENT BY TAGUCHI METHOD WITH SIMULATION(Technical Session 1A: Manufacturing Systems and Scheduling 1) 1A2 Postponement of Stock Order management using Multi Decoupling Point on Bill-Of-Materials Structure(Technical Session 1A: Manufacturing Systems and Scheduling 1) 1B1 ASSIGNMENT OF HUMAN OPERATORS TO MACHINE TOOLS AND SCHEDULING CONSIDERING STATISTICAL DISTRIBUTION OF PROCESSING TIMES(Technical Session 1B: Workforce Scheduling 1) 1B2 Scheduling Work Shifts to Fit Customer Buying Behavior : Increasing Time Waiting on Customers and Subsequently Retail Sales by Improving Work Efficiency(Technical Session 1B: Workforce Scheduling 1) 2A1 A STUDY ON OPTIMAL LOT ASSIGNMENTS IN SEMICONDUCTOR PRODUCTION SCHEDULING PROBLEM(Technical Session 2A: Manufacturing System and Scheduling 2) 2A2 DYNAMIC BATCH JOB SHOP SCHEDULING FOR MULTI ITEMS AND MULTI DATES WITH TOTAL ACTUAL FLOW TIME AS PERFORMANCE CRITERIA(Technical Session 2A: Manufacturing System and Scheduling 2) 2A3 A DYNAMIC SCHEDULING USING RESCHEDULING STRATEGY AND REDUCTION PROCESSING TIME(Technical Session 2A: Manufacturing System and Scheduling 2) 2B1 LABOR SCHEDULING PROGRAM FOR SUPERMARKETS FOCUSED ON MONTHLY PRODUCTIVITY : Case Study on Checkout, Meat, and Delicatessen Departments(Technical Session 2B: Workforce Scheduling 2) 2B2 A RECURSIVE APPROACH FOR SOLVING NURSE REROSTERING PROBLEMS WITH A SUDDEN ABSENCE FOR SEVERAL CONSECUTIVE DAYS(Technical Session 2B: Workforce Scheduling 2) 2B3 AN IMPLEMENTATION OF AN AIRLINE PILOT SCHEDULING SYSTEM(Technical Session 2B: Workforce Scheduling 2) K1 WORKFORCE SCHEDULING : MODELS, METHODS AND FUTURE CHALLENGES(Keynote Speech) 3A1 PSEUDO-POLYNOMIAL TIME ALGORITHMS FOR FOOD MIXTURE PACKING BY AUTOMATIC COMBINATION WEIGHERS(Technical Session 3A: Combinatorial Optimization 1) 3A2 MAXIMIZING THE TOTAL WEIGHT OF JUST-IN-TIME JOBS UNDER MULTI-SLOT CONDITIONS IS NP-HARD(Technical Session 3A: Combinatorial Optimization 1) 3B1 POSSIBILISTIC PROGRAMMING APPROACH FOR MULTI-OBJECTIVE INVENTORY PROBLEM IN TWO-ECHELON SUPPLY CHAIN SYSTEM(Technical Session 3B: SCM and Logistics 1) 3B2 THREE ECHELON LOGISTICS OPTIMIZATION FOR OPERATIONAL PLANNING(Technical Session 3B: SCM and Logistics 1) 4A1 EFFICIENT CONSTRUCTION HEURISTIC ALGORITHMS FOR THE RECTILINEAR BLOCK PACKING PROBLEM(Technical Session 4A: Combinatorial Optimization 2) 4A2 APPLICATIONS OF POPULAR MATCHINGS ON CAMPUS(Technical Session 4A: Combinatorial Optimization 2) 4B1 Column Generation Heuristics to Route Planning Problems for Automated Guided Vehicles with Acceleration and Deceleration(Technical Session 4B: SCM and Logistics 2) 4B2 A Multi-Objective Genetic-Algorithm Including Dynamic Control of New Chromosomes for Logistic Problem with Inventory Control(Technical Session 4B: SCM and Logistics 2) 5A1 OPTIMUM BUDGET AND SCHEDULE FOR PROJECTS WITH UPSTREAM-DEPENDENT RISKS(Technical Session 5A: Resource Allocation and Scheduling) 5A2 OPTIMAL PLACEMENT OF BIKES USING QUEUEING NETWORKS(Technical Session 5A: Resource Allocation and Scheduling) 5A3 WORKER ALLOCATION OPTIMIZATION OF TWO SPECIAL WORKERS WITH RANDOM VARIABLE TARGET PROCESSING TIME IN LIMITED-CYCLE MULTIPLE PERIODS(Technical Session 5A: Resource Allocation and Scheduling) 5B1 MODELS AND PROCEDURE OF SUPPLY CHAIN MANAGEMENT GAME USING CLOUD DATA EXCHANGE(Technical Session 5B: SCM and Logistics 3) 5B2 HIGH RESOLUTION SUPPLY CHAIN MANAGEMENT : ANALYZING THE IMPACT OF POINT OF SALE DATA ON HUMAN DECISION MAKING IN A VIRTUAL SUPPLY CHAIN SCENARIO(Technical Session 5B: SCM and Logistics 3) 5B3 REAL-TIME CAPABLE SUPPLY CHAIN PLANNING : DESIGNING A COLLABORATIVE SUPPLY CHAIN CONCEPT BASED ON REAL-TIME DATA(Technical Session 5B: SCM and Logistics 3) I1 Development of Dynamic exchange dissassembly order algorithm for the purpose of fast automatic generation of assembly animation and 3D work instruction sheets(Invited Talk) K2 Disassembly : A Comprehensive Overview(Keynote Speech) 6A1 FACILITY LOCATION DESIGN METHODOLOGY OF GLOBAL SUPPLY CHAIN : AUTOMATIC EXTRACTION OF OPTIMAL FACILITY LOCATION DESIGN IDEA IN CONST STANDARD(Technical Session 6A: SCM and Logistics 4) 6A2 A Game Theoretic Approach to Three-echelon Supply Chains with Asymmetric Quality Information(Technical Session 6A: SCM and Logistics 4) 6A3 A CLOSED-LOOP SUPPLY CHAIN MODEL FOR PARTS REUSE CONSIDERING ECONOMICEFFICIENCY(Technical Session 6A: SCM and Logistics 4) 6B1 Low-Carbon Supplier Selection Using Life Cycle Inventory Database in China and Japan(Technical Session 6B: Green Logistics) 6B2 An Optimal Design for Global Supply Chain Network Considering CO2 Emissions of Part Production(Technical Session 6B: Green Logistics) 6B3 SIMULATION ANALYSIS OF SUPPLY CHAIN NETWORK WITH STOCHASTIC LEAD TIME(Technical Session 6B: Green Logistics) I2 Cyclic Re-entrant Flow Shop Scheduling Problem : Approach from mathematical programming(Invited Tutorial)
Proceedings of International Symposium on Scheduling 2011
刊行2011-07-02
インターネットで読める国立国会図書館
目次COVER Proceedings of International Symposium on Scheduling 2011(Title Page) Preface Welcome Organization of International Symposium on Scheduling 2011 Program at a glance FloorMap Program 1A1 MULTIPLE EXCHANGES OF JOB ORDERS FOR LOCAL SEARCH OF NO-BUFFER JOB SHOP SCHEDULING PROBLEM(Technical session 1A: OS1: Practical scheduling approach(1)) 1A2 A STUDY ON INTEGRATION OF INTERDIVISIONAL SCHEDULING IN DYNAMICALLY CHANGING MANUFACTURING ENVIRONMENT(Technical session 1A: OS1: Practical scheduling approach(1)) 1A3 NEW PROACTIVE TIME BUFFER HEURISTICS FOR ROBUST PROJECT SCHEDULING(Technical session 1A: OS1: Practical scheduling approach(1)) 1B1 AN EXACT ALGORITHM FOR SINGLE-MACHINE SCHEDULING WITHOUT INTERMEDIATE IDLE TIMES(Technical session 1B: Machine and shop scheduling) 1B2 AN APPROXIMATION ALGORITHM FOR MAXIMIZING WEIGHTED NUMBER OF JUST-IN-TIME JOBS ON UNRELATED PARALLEL MACHINES(Technical session 1B: Machine and shop scheduling) 1B3 MULTI-OBJECTIVE ANALYSIS APPLIED TO MIXED-MODEL ASSEMBLY LINE SEQUENCING PROBLEM THROUGH ELITE INDUCED EVOLUTIONARY METHOD(Technical session 1B: Machine and shop scheduling) 1C1 A HEURISTIC APPROACH FOR INTERNATIONAL CRUDE OIL TRANSPORTATION SCHEDULING PROBLEMS(Technical session 1C: Supply chain and logistics) 1C2 EVALUATION OF MULTI-LAYERED DYNAMIC SUPPLY CHAIN MODELS WITH COOPERATIVE NEGOTIATION(Technical session 1C: Supply chain and logistics) 1C3 INTEGRATED SCHEDULING OF PRODUCTION AND DISTRIBUTION FOR PERISHABLE FOODS(Technical session 1C: Supply chain and logistics) 2A1 DEVELOPMENT OF SCHEDULING SYSTEM FOR HUMAN OPERATORS CONSIDERING UNCERTAINTY OF PROCESSING TIME(Technical session 2A: OS1: Practical scheduling approach(2)) 2A2 SCHEDULING METHOD IN REAL-VIRTUAL FUSION MANUFACTURING SYSTEM WITH SOCIAL CONTRACT BASED APPROACH : APPLICATION OF COMBINATORIAL AUCTION AT OPERATIONAL PHASE(Technical session 2A: OS1: Practical scheduling approach(2)) 2A3 A STUDY ON PREVENTIVE MAINTENANCE SCHEDULING USING DISTRIBUTED COOPERATIVE APPROACH(Technical session 2A: OS1: Practical scheduling approach(2)) 2B1 DEVELOPMENT OF TRAINING PROGRAM FOR INFORMATION SYSTEM DESIGN USING MATERIALS REQUIREMENT PLANNING(Technical session 2B: Planning) 2B2 DYNAMIC WORK PLANNING USING REINFORCEMENT LEARNING IN CONSIDERATION OF WORKERS' SKILL AND TRAINING(Technical session 2B: Planning) 2B3 A MPL-CCPM FRAMEWORK FOR SYSTEMS WITH MULTIPLE INPUTS(Technical session 2B: Planning) 2C1 CASE STUDIES OF SCHEDULING IN TRAFFIC SERVICES BY OPTIMIZATION TECHNIQUE(Technical session 2C: OS2: Timetabling and assignment problems(1)) 2C2 OPTIMAL ASSIGNMENT OF RAPID TRAIN STOPS : EXAMPLE OF THE JR NAMBU LINE(Technical session 2C: OS2: Timetabling and assignment problems(1)) 2C3 Using SAT Solver for Nurse Scheduling Problem(Technical session 2C: OS2: Timetabling and assignment problems(1)) 3A1 THE IMPLEMENTABILITY OF AGENT BASED AUTONOMOUS DECENTRALIZED ASSEMBLY SYSTEM(Technical session 3A: Agent and negotiation) 3A2 A TRIAL OF INVERSE-MANUFACTURING PRODUCT ANALYSIS IN A MULTI AGENT SYSTEM(Technical session 3A: Agent and negotiation) 3A3 MANAGEMENT SYSTEM FOR CONSTRUCTION PRODUCTION WITH MULTI-LAYER SIMULTANEOUS AUCTIONS(Technical session 3A: Agent and negotiation) 3B1 ROBUST ENERGY MANAGEMENT SYSTEM WITH ELECTRIC VEHICLES(Technical session 3B: Scheduling under uncertainty) 3B2 An Optimal Solution for Mass Customization Production Planning System with Uncertain Advance Demand Information(Technical session 3B: Scheduling under uncertainty) 3B3 An inventory model for items under time-varying demand rates with credit period and cash discount for a finite time horizon(Technical session 3B: Scheduling under uncertainty) 3C1 A METHOD FOR THE LABORATORY ASSIGNMENT PROBLEM WITH LOWER AND UPPER BOUNDS FOR CAPACITY(Technical session 3C: OS2: Timetabling and assignment problems(2)) 3C2 INVERSE ASSIGNMENT PROBLEM FOR TIMETABLING IN TUTORING SCHOOL(Technical session 3C: OS2: Timetabling and assignment problems(2)) 3C3 AN ALGORITHM TO FIND A SCHEDULING TABLE FOR EMBEDDED SYSTEMS(Technical session 3C: OS2: Timetabling and assignment problems(2)) 4A1 PETRI NET DECOMPOSITION APPROACH FOR AGV SYSTEMS TO MINIMIZE THE DEVIATION OF DELIVERY TIME AND TOTAL TRANSPORTATION TIME(Technical session 4A: Material handling system) 4A2 NETWORK TRANSFORMATION HEURISTICS FOR MULTI-STORY STORAGE RACK PROBLEMS(Technical session 4A: Material handling system) 4A3 AN ONLINE SCHEDULING ALGORITHM THAT MINIMIZES THE TOTAL COMPLETION TIME IN AN AGV SYSTEM AND ITS COMPETITIVE ANALYSIS(Technical session 4A: Material handling system) 4B1 A STUDY OF THE PROPER AMOUNT OF WORK-IN-PROCESS INVENTORY FOR MULTIPURPOSE INTERMEDIATE PRODUCTS(Technical session 4B: Practical systems) 4B2 Basic Theory of Daily Packet Supply Chain APS : A Production Control System including SCM(Technical session 4B: Practical systems) 4B3 OPTIMUM SCHEDULING SYSTEM USING PETRI-NET AND REINFORCEMENT LEARNING FOR JSP BENCHMARKS(Technical session 4B: Practical systems) 4C1 SIMULATION BASED DIFFUSION ANALYSIS OF PLURAL COMPETING SERVICES IN CONSUMER NETWORKS : INTRODUCING HETEROGENEITY INTO CONSUMER UTILITY(Technical session 4C: OS3: Service engineering(1)) 4C2 PROCESS MANAGEMNT IN RESTAURANT SERVICE : A case study of Japanese restaurant chain(Technical session 4C: OS3: Service engineering(1)) 4C3 A NEGOTIATION BASED MODEL FOR SUPPLIER SELECTION PROBLEM(Technical session 4C: OS3: Service engineering(1)) K2 PRODUCTION MANAGEMENT AND INFORMATION TECHNOLOGY OUTSIDE OF THE IVORY TOWER(Keynote speech) K3 THE FUTURE OF ELECTRICITY GRID : INTEGRATION OF RENEWABLE ENERGY AND DEMAND RESPONSE(Keynote speech) 5A1 HEURISTICS FOR MATHEMATICAL PROGRAMMING BASED RAILWAY CREW SCHEDULING(Technical session 5A: OS4: Railway scheduling) 5A2 AUTOMATIC CONSTRUCTION OF TRAIN ARRIVAL AND DEPARTURE SCHEDULES IN TERMINAL STATIONS(Technical session 5A: OS4: Railway scheduling) 5A3 A REINFORCEMENT LEARNING FOR MARSHALING OF FREIGHT CARS IN A TRAIN BASED ON THE PROCESSING TIME(Technical session 5A: OS4: Railway scheduling) 5A4 COLUMN GENERATION FOR THE TRAIN-SET SCHEDULING PROBLEM WITH REGULAR MAINTENANCE CONSTRAINTS(Technical session 5A: OS4: Railway scheduling) 5B1 IMPROVED IMPLEMENTATION OF AN APPROXIMATION ALGORITHM WITH FACTOR TWO FOR A CYCLIC ROUTING PROBLEM OF GRASP-AND-DELIVERY ROBOTS(Technical session 5B: Routing problems) 5B2 A TWO-PROBE ROUTING MODEL AND AN ALGORITHM FOR MCM SUBSTRATES TESTING(Technical session 5B: Routing problems) 5B3 APPROXIMATING CYCLIC ROUTING PROBLEMS OF GRASP-AND-DELIVERY ROBOTS IN PRODUCTION OF PRINTED CIRCUIT BOARDS(Technical session 5B: Routing problems) 5C1 Approach for decreasing quality dispersion of manufacturing in labor-intensive works based on DMAIC of Six Sigma(Technical session 5C: OS3: Service engineering(2)) 5C2 Proposal of effective computation environment for TSP using Cloud Computing(Technical session 5C: OS3: Service engineering(2)) Copyright Information
Proceedings of International Symposium on Scheduling 2009
刊行2009-07-04
インターネットで読める国立国会図書館
目次COVER Preface Welcome to Int. S. S. 2009 Organization of International Symposium on Scheduling 2009 PROGRAM AT A GLANCE Program K1 A CONTAINERSHIP ROUTING MODEL FOR HUB-AND-SPOKE NETWORKS 1A1 COMBINATORIAL OPTIMIZATION PROBLEMS AND ALGORITHMS IN DOUBLE-LAYERED FOOD PACKING EQUIPMENTS 1A2 SHIP SCHEDULING IN THE STEEL INDUSTRY : A ROSSING-HORIZON AND APPROXIMATE DYNAMIC PROGRAMMING APPROACH 1A3 THE OPTION VALUATION FOR RDA PROJECT WITH PATENT DECISIONS 1B1 AN IMPLEMENTATION OF A TWO-PHASE METAHEURISTIC APPROACH FOR THE MULTI-DEPOT VEHICLE ROUTING OPTIMIATION WITH SIMULTANEOUS DELIVERY AND PICKUP 1B2 The Multicover Problem in Graphs arising from Patrol Route Planning 1B3 SIMULTANEOUS DISPATCHING AND CONFLICT-FREE ROUTING FOR AUTOMATED GUIDED VEHICLES USING PETRI NET DECOMPOSITION APPROACH 1C1 DYNAMIC WORK PLANNING BY USING SIMULATION-BASED OPTIMIZATION IN CONSIDERATION OF WORKERS' SKILL AND TRAINING 1C2 TWO-PROBE ROUTING IN INSPECTION OF CIRCUIT BOARDS 1C3 A HEURISTIC ALGORITHM FOR THE NODE CAPACITATED IN-TREE PACKING PROBLEM K2 SUPPLY CHAIN MODELING LANGUAGE FOR OPTIMIZATION 2A1 ANT-COLONY BASED OPTIMIZATION APPROACH FOR DISTRIBUTION CENTRE ALLOCATION PROBLEM 2A2 A HYBRID META-HEURISTIC APPROACH FOR MULTI-COMMODITY LOGISTICS OPTIMIZATION OVER PLANNING HORIZON 2A3 ORDER COMMITMENT CONTRACTS IN A COLLABORATIVE SUPPLY CHAIN 2B1 INTELLIGENT PRODUCTION CONTROL SYSTEM FOR MULTI-MACHINES 2B2 AN IMPROVED ALGORITHM FOR THE SINGLE-MACHINE TOTAL WEIGHTED TARDINESS PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES 2B3 A LOCAL SEARCH APPROACH FOR THE JOBSHOP SCHEDULING PROBLEM WITH DEADLINES AND CONTROLLABLE PROCESSING TIMES 2C1 ANALYSIS OF MECHANICAL PROPERTIES AND MICROSTRUCTURE OF SM 490 SAW WELDING RESULT 2C2 INVESTIGATION OF ULTRASONIC WASHING SYSTEM ON REDUCTION OF OIL CONTAMINATION ON MACAHING PARTS 2C3 Evaluation Method of Environmental Burden for Manufacturing Process 3A1 CO-EVOLUTIONARY GENETIC ALGORITHMS FOR REACTIVE SCHEDULING 3A2 AN APPROACH USING GENETICS-BASED MACHINE LEARNING TO COMPLEMENTING LEGACY RULES FOR THE ELEVATOR OPERATION 3A3 DETERMINISTIC MODEL FOR REACTIVE SCHEDULING : SCHEDULE MULTIPLEXING APPROACH 3B1 AN AGENT BEHAVIOUR TECHNIQUE IN AN AUTONOMOUS DECENTRALIZED MANUFACTURING SYSTEM 3B2 MEMBRANOUS MULTI AGENT SYSTEM IN FLEXIBLE MANUFACTURING SYSTEMS 3B3 A MULTI-AGENT SYSTEM FOR DISCRETE PROCESS-DESIGN 3C1 AN LP-BASED ALGORITHM FOR SCHEDULING PREEMPTIVE AND/OR NON-PREEMPTIVE REAL-TIME TASKS 3C2 IMPROVEMENT OF CONVERGENCE OF COLUMN GENERATION FOR RAILWAY CREW SCHEDULING PROBLEM 3C3 A TRANSSHIPMENT PROBLEM WITH A PREMUTABLE TRANSIT VECTOR 4A1 THE ANALYSIS ON THE SURVEYS IN THE DEVELOPMENT OF INDUSTRIAL AGGLOMERATION IN THAILAND 4A2 AN OPTIMAL EOQ POLICY WITH ADVANCE SALES DISCOUNT AND RETAILER'S PARTIAL TRADE CREDIT 4A3 EVALUATING MANUFACTURING SUPPORTING ACTIVITIES ON BUSINESS PERFORMANCE : A CASE OF THAI INDUSTRIES 4B1 Mass Customization Production Planning System for Multi-process 4B2 DUE-DATE ESTIMATION AND PRODUCTION SCHEDULING FOR CUSTOMER ORDERS WITH UNFIXED SPECIFICATION 4B3 EFFICIENT HEURISTICS FOR DETERMINING NEAR-OPTIMAL LOT SIZES FOR MRP SYSTEMS 4C1 SCHEDULING MULTIPROCESSOR TASKS WITH PROMPT SERVICE CONSTRAINTS ON ALIGNED IDENTICAL PROCESSORS 4C2 A TWO-LEVEL METHOD OF PARALLEL COMPUTING FOR LOGISTICS NETWORK OPTIMIZATION THROUGH HYBRID DISCRETE PSO 4C3 AN ADAPTIVE MEMORY LAGRANGIAN HEURISTIC ALGORITHM BASED ON THE SET COVERING APPROACH FOR THE MULTICUT PROBLEM 5A1 SCHEDULING A WAFER FABRICATION FACTORY WITH A FUZZY-NEURO APPROACH 5A2 A SIMULATION STUDY IN DESIGNING A MANUFACTURING CELL WITH GROUP TECHNOLOGY 5A3 SCHEDULING OF ROBOTICS RESEARCH AND ROBOTICS EDUCATION 5B1 NUMERICAL ANALYSIS OF A CONTRACT MODEL WITH A SUPPLIER, MULTIPLE RETAILERS, PRICE AND SAFETY STOCK-DEPENDENT DEMAND 5B2 MULTI-OBJECTIVE ANALYSIS OF PERIODIC REVIEW INVENTORY PROBLEM WITH COORDINATED REPLENISHMENT IN TWO-ECHELON SUPPLY CHAIN SYSTEM 5B3 DETERMINING REORDER INTERVALS FOR GENERAL PRODUCTION-DISTRIBUTION SYSTEMS 5C1 QUANTIFICATION OF QUALITY LOSS DURING DISTRIBUTION OF FRESH PRODUCTS : A PROPOSED STUDY OF FROZEN SHRIMP INDUSTRY IN THAILAND 5C2 STUDY FOR SYSTEM ARCHITECTURE IN PROJECT BASED PRODUCTION 5C3 A Study on Optimization Method for Production Scheduling with Batch Process by Combinatorial Auction K3 SCHEDULING IN CHEMICAL AND REFINING INDUSTRIES
Proceedings of International Symposium on Scheduling 2006
刊行2006-07-18
インターネットで読める国立国会図書館
目次COVER Copyright Information Proceedings of International Symposium on Scheduling 2006(Title Page) Preface Welcome Organization of International Symposium on Scheduling 2006 Gate Scheduling at Airports Production Scheduling to Decrease Transportation Costs Cyclic Machine Scheduling : A General Framework PROGRAM AT A GLANCE CONTENTS K1 GATE SCHEDULING AT AIRPORTS(Keynote Speech) 1A1 Scheduling of Corrugated Paper Production(Technical session 1A: Combinatorial optimization) 1A2 AN IMPROVED APPROXIMATION ALGORITHM FOR CAPACITATED MULTICAST ROUTINGS IN NETWORKS(Technical session 1A: Combinatorial optimization) 1B1 A STUDY ON INTEGRATED PROCESS PLANNING AND SCHEDULING SYSTEM FOR HOLONIC MANUFACTURING SYSTEMS : MODIFICATION OF PROCESS PLANS(Technical session 1B: Manufacturing systems) 1B2 LIFE ANALYSIS OF MODULES REUSE FOR CIRCULATION PRODUCTION(Technical session 1B: Manufacturing systems) 2A1 Sedan Shift Scheduling Model(Technical session 2A: Application and practice 1) 2A2 SUBCONTRACTORS SCHEDULING ON RESIDENTIAL BUILDINGS CONSTRUCTION SITES(Technical session 2A: Application and practice 1) 2A3 DEVELOPMENT OF A SHIPBUILDING SCHEDULING SYSTEM UTILIZING A WEIGHTED CONSTRAINT SATISFACTION PROBLEM SOLVER(Technical session 2A: Application and practice 1) 2B1 A DP-BASED HEURISTIC ALGORITHM FOR THE DISCRETE SPLIT DELIVERY VEHICLE ROUTING PROBLEM(Technical session 2B: Vehicle scheduling and communication) 2B2 HIERARCHICAL APPROACH WITH INFORMATIONAL FEEDBACK FOR PICKUP AND DELIVERY PROBLEMS(Technical session 2B: Vehicle scheduling and communication) 2B3 A NOVEL DESIGN AID FOR SCHEDULING POLICY TOWARD SEAMLESS FUTURE-ORIENTED LAND VEHICLE SATELLITE COMMUNICATIONS(Technical session 2B: Vehicle scheduling and communication) 3A1 DYNAMIC ROBUST SET OF APPROXIMATE NONDOMINATED SOLUTIONS UNDER SCENARIOS(Technical session 3A: Scheduling under uncertainty 1) 3A2 Online Rescheduling in Semiconductor Manufacturing(Technical session 3A: Scheduling under uncertainty 1) 3B1 A Basic Study on Cost Based Lot Sizing : Experiments with Distributed Virtual Factory(Technical session 3B: Virtual factory) 3B2 MANUFACTURING CELL SIMULATION ENVIRONMENT SYNCHRONISING REAL EQUIPMENT AND VIRTUAL FACTORY MODEL(Technical session 3B: Virtual factory) 4A1 ROBUST SCHEDULING UNDER UNCERTAINTY IN PROCESSING TIME(Technical session 4A: Scheduling under uncertainty 2) 4A2 A FORMAL MODEL FOR REACTIVE SCHEDULING PROBLEMS(Technical session 4A: Scheduling under uncertainty 2) 4B1 DEVELOPMENT OF NEW ENCODING METHOD FOR THE COMPLEX PRODUCTION SYSTEMS(Technical session 4B: Genetic algorithm and Agent based-system) 4B2 WORK SCHEDULING BY USE OF WORKER MODEL IN CONSIDERATION OF LEARNING BY ON-THE-JOB TRAINING(Technical session 4B: Genetic algorithm and Agent based-system) K2 PRODUCTION SCHEDULING TO DECREASE TRANSPORTATION COSTS(Keynote speech) 5A1 Supply Chain Management of the Iron and Steel Industry(Technical session 5A: Application and practice 2) 5A2 SIMULTANEOUS OPTIMIZATION OF STORAGE ALLOCATION AND ROUTING PROBLEMS FOR BELT-CONVEYOR TRANSPORTATION(Technical session 5A: Application and practice 2) 5A3 GENETIC ALGORITHM WITH REDUCTION OF SEARCH SPACE USING OPERATIONAL CONSTRAINTS AND ITS APPLICATION TO SCHEDULING SYSTEM FOR STEELMAKING PROCESS(Technical session 5A: Application and practice 2) 5B1 A GUIDED LOCAL SEARCH ALGORITHM BASED ON A FAST NEIGHBORHOOD SEARCH FOR THE IRREGULAR STRIP PACKING PROBLEM(Technical session 5B: Packing problem) 5B2 AN ITERATED LOCAL SEARCH ALGORITHM BASED ON NONLINEAR PROGRAMMING FOR THE IRREGULAR STRIP PACKING PROBLEM(Technical session 5B: Packing problem) 5B3 LEARNING HUMAN SKILLS INSTEAD OF SOLVING OPTIMISATION PROBLEMS : A PACKING PROBLEM EXAMPLE(Technical session 5B: Packing problem) 6A1 SCHEDULING IN A TWO-MACHINE FLOWSHOP FOR THE MINIMIZATION OF THE SUM OF ABSOLUTE DEVIATIONS FROM A COMMON DUE DATE(Technical session 6A: Machine and shop scheduling 1) 6A2 A BRANCH-AND-BOUND ALGORITHM BASED ON LARGRANGIAN RELAXATION FOR SINGLE-MACHINE SCHEDULING(Technical session 6A: Machine and shop scheduling 1) 6B1 DECOMPOSITION OF PETRI NETS FOR SOLVING GENERAL SCHEDULING PROBLEMS(Technical session 6B: General model for scheduling and assignment problem) 6B2 AN ITERATED LOCAL SEARCH ALGORITHM FOR THE MULTI-RESOURCE GENERALIZED ASSIGNMENT PROBLEM WITH FLEXIBLE ASSIGNMENT COST(Technical session 6B: General model for scheduling and assignment problem) 6B3 A UNIFIED MODELING AND SOLUTION PRINCIPLE FOR FINE SCHEDULING(Technical session 6B: General model for scheduling and assignment problem) 7A1 REAL-TIME MACHINE SCHEDULING WITH VARIABLE DURATIONS(Technical session 7A: Machine and shop scheduling 2) 7A2 A Heuristic Scheduling Algorithm for Multi-stage Job-shop Process with Crane Handling(Technical session 7A: Machine and shop scheduling 2) 7B1 EVOLUTIONAL OPTIMIZATION ON MATERIAL ORDERING AND INVENTORY CONTROL OF SUPPLY CHAIN THROUGH INCENTIVE SCHEME(Technical session 7B: Supply chain) 7B2 PROPOSAL OF COLLABORATION IN SUPPLY CHAIN FOR IMPLEMENTING MASS CUSTOMIZATION(Technical session 7B: Supply chain) 8A1 MULTIAGENT BASED PRODUCTION CONTROL TO PREVENT CAPACITY LOSS DURING FAILURES(Technical session 8A: Production control) 8A2 BASE STOCK POLICY IN A JOIN-TYPE PRODUCTION LINE WITH ADVANCED DEMAND INFORMATION(Technical session 8A: Production control) 8B1 PRODUCTION PLANNING SYSTEM FOR IMPLEMENTING MASS CUSTOMIZATION BY USING PARTICLE SWARM OPTIMIZATION(Technical session 8B: Customer orientation) 8B2 PROPOSED METHOD FOR RECOMMENDING GOODS USING A MATHEMATICAL PLANNING MODEL(Technical session 8B: Customer orientation) K3 CYCLIC MACHINE SCHEDULING : A GENERAL FRAMEWORK(Keynote speech) General Information
Proceedings of International Symposium on Scheduling 2004
刊行2004-05-24
インターネットで読める国立国会図書館
目次COVER Proceedings of International Symposium on Scheduling 2004(Title Page) WELCOME TO ISS'04 Welcome to ISS04, Kobe-Awaji, Japan Greetings Organization of International Symposium on Scheduling 2004 PROGRAM AT A GRANCE Building General Solvers for Scheduling Problems(KEYNOTE SPEECHES) Dominance Orders for Scheduling Problems(KEYNOTE SPEECHES) Minimum Vertex Ranking Spanning Tree Problem(TUTORIAL SPEECH) PROGRAM K1 BUILDING GENERAL SOLVERS FOR SCHEDULING PROBLEMS(Keynote speech) 1A1 A Q-LEARNING FOR GROUP-BASED PLAN OF CONTAINER TRANSFER SCHEDULING(Technical session 1A : Transportation) 1A2 TRANSPORT SCHEDULING WITH SERVICE-LEVEL CONSTRAINTS : COMPLEXITY AND ALGORITHMS(Technical session 1A : Transportation) 1A3 MOTION PATH OPTIMIZATION IN MOBILE GANTRY-TYPE WELDING SYSTEM(Technical session 1A : Transportation) 1A4 Prediction-Based Simulation for Molten Metal Logistics(Technical session 1A : Transportation) 1B1 TABU SEARCH FOR RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM(Technical session 1B : Meta Heuristics) 1B2 AN APPLICATION OF THE GENETIC ALGORITHM TO A TWO-MACHINE ROBOTIC FLOW-SHOP SCHEDULING PROBLEM(Technical session 1B : Meta Heuristics) 1B3 ADVANCED WIP CONTROL METHOD FOR SEMICONDUCTOR MANUFACTURING(Technical session 1B : Meta Heuristics) 1B4 SCHEDULING PHOTOGRAPHS OF AN AGILE EARTH OBSERVING SATELLITE BY A TABU SEARCH ON A CONSISTENT NEIGHBORHOOD(Technical session 1B : Meta Heuristics) T1 MINIMUM VERTEX RANKING SPANNING TREE PROBLEM : A TUTORIAL(Tutorial speech) K2 DOMINANCE ORDERS FOR SCHEDULING PROBLEMS(Keynote speech) 2A1 OPTIMIZING THE PROFIT OF AN APPAREL MANUFACTURER IN DEVELOPING COUNTRY(Technical session 2A : Production and Inventory) 2A2 A RE-ENGINEERING PROJECT BASED ON THE TOC FUNDAMENTAL MEASUREMENTS(Technical session 2A : Production and Inventory) 2A3 AN INVENTORY REPLENISHMENT MODEL FOR DETERIORATING ITEMS WITH TIME-VARYING DEMAND AND SHORTAGES USING GENETIC ALGORITHM(Technical session 2A : Production and Inventory) 2A4 A STUDY ON THE PERIOD PLANNING MODEL FOR ITEMS WITH SUCCESSIVE DIFFERENT DEMAND PERIODS(Technical session 2A : Production and Inventory) 2B1 CONSTRAINT PROGRAMMING FOR DYNAMIC SCHEDULING PROBLEMS(Technical session 2B : Combinatorics 1) 2B2 TWO TYPES OF BRANCH-AND-BOUND ALGORITHMS FOR THE SCHEDULING PROBLEM TO MINIMIZE TOTAL TARDINESS ON IDENTICAL PARALLEL MACHINES(Technical session 2B : Combinatorics 1) 2B3 MULTI-PERIOD MULTI-DIMENSIONAL KNAPSACK PROBLEM AND ITS APPLICATION TO AVAILABLE-TO-PROMISE(Technical session 2B : Combinatorics 1) 2B4 PREEMPTIVE SCHEDULING ON PARALLEL PROCESSORS WITH DUE DATES(Technical session 2B : Combinatorics 1) 3A1 SINGLE SIMULATION BUFFER OPTIMIZATION(Technical session 3A : Sophisticated scheduling 1) 3A2 A SEQUENCING PROBLEM FOR MIXED-MODEL ASSEMBLY LINE WITH THE HELP OF RELIEF-MAN(Technical session 3A : Sophisticated scheduling 1) 3A3 IMPROVEMENT OF HEURISTIC METHOD FOR PRODUCTION PLANNING PROBLEM IN AUTO PARTS SUPPLIER(Technical session 3A : Sophisticated scheduling 1) 3A4 CUMULATIVE DELAY BASED REACTIVE SCHEDULING OF A SINGLE MACHINE WITH RANDOM DISRUPTIONS(Technical session 3A : Sophisticated scheduling 1) 3B1 MODELLING THE ASSIGNEMENT OF OPERATORS TO MACHINES(Technical session 3B : Combinatorics 2) 3B2 A PROCEDURE FOR PREPARING PROBLEM SPECIFICATIONS IN THE GERM FORMAT(Technical session 3B : Combinatorics 2) 3B3 Complexity of a dynamic lot-scheduling problem formulated by a 0-1 pure integer programming(Technical session 3B : Combinatorics 2) 3B4 ON OPTIMAL SCHEDULING PROBLEMS FOR PARALLLEL MACHINES WITH A SINGLE SERVER(Technical session 3B : Combinatorics 2) 4A1 A LOCAL SEARCH ALGORITHM FOR ROUTING AND SCHEDULING PROBLEMS WITH TIME WINDOW AND TRAVELING TIME CONSTRAINTS(Technical session 4A : Vehicle routing) 4A2 THE VEHICLE ROUTING PROBLEMS WITH A LARGE-VOLUME CUSTOMER OR WITH TIME WINDOW CONSTRAINTS BY DECENTRALIZED PROBABILISTIC ALGORITHM(Technical session 4A : Vehicle routing) 4A3 ROUTING AND SCHEDULING FOR DELIVERY OF PRODUCTS UNDER VENDOR MANAGED INVENTORY SCHEME(Technical session 4A : Vehicle routing) 4B1 METHODS OF TRANSPOSITION OF NURSES BETWEEN WARDS(Technical session 4B : Personnel scheduling) 4B2 AN INVERSE PROBLEM APPROACH TO PERSONNEL SCHEDULING(Technical session 4B : Personnel scheduling) 4B3 INTERACTIVE MULTI-SHIFT SCHEDULING TO SATISFY WORKER'S PREFERENCE ON SHIFT AND DAYS-OFF(Technical session 4B : Personnel scheduling) 5A1 SCHEDULING IN TRADITIONAL CONSTRUCTION METHODS(Technical session 5A : Sophisticated scheduling 2) 5A2 COMPOSITION AND ACQUISITION OF RULES FOR FLEXIBLE SHOP SCHEDULING PROBLEMS(Technical session 5A : Sophisticated scheduling 2) 5A3 ONLINE SCHEDULING FOR FLEXIBLE FLOW SHOPS WITH DUE DATE CONSTRAINT(Technical session 5A : Sophisticated scheduling 2) 5A4 DUE-DATE CONFORMANCE-ORIENTED SCHEDULING METHOD ALLOWING SMALL LOT-SIZE JOB INTERVENTION(Technical session 5A : Sophisticated scheduling 2) 5B1 AN AUTOMATIC DECOUPLING CONTROLLER FOR SHIP HARBOR MANEUVERS AND ITS ROBUSTNESS EVALUATION(Technical session 5B : Ship) 5B2 ONLINE ESTIMATION OF SHIP STEERING DYNAMICS AND ITS APPLICATIONS IN DESIGNING AN OPTIMAL AUTOPILOT(Technical session 5B : Ship) 5B3 SHIP'S OPTIMAL AUTOPILOT USING A REGRESSIVE EXOGENOUS MODEL(Technical session 5B : Ship) 5B4 STUDY ON AN OPTIMAL ADAPTIVE SHIP AUTOPILOT(Technical session 5B : Ship) 6A1 A heuristic analysis for integrating disassembly planning and scheduling(Technical session 6A : Sophisticated scheduling 3) 6A2 EVALUATION OF TOOL ALLOCATION STRATEGIES IN FLEXIBLE MANUFACTURING SYSTEM(Technical session 6A : Sophisticated scheduling 3) 6A3 BRANCH AND BOUND METHOD WITH GENETIC ALGORITHM FOR FLEXIBLE FLOWSHOP SCHEDULING(Technical session 6A : Sophisticated scheduling 3) 6B1 LAGRANGEAN DECOMPOSITION COORDINATION METHOD FOR MULTI-ITEM MULTI-PROCESS DYNAMIC LOT SIZE SCHEDULING(Technical session 6B : Lagrangian decomposition) 6B2 ADOPTING DUE-DATE BUFFER FOR REAL-TIME SCHEDULING USING LAGRANGEAN RELAXATION METHOD IN AN APS ENVIRONMENT(Technical session 6B : Lagrangian decomposition) 6B3 A NEW LAGRANGIAN DECOMPOSITION AND COORDINATION METHOD FOR SINGLE-MACHINE TOTAL WEIGHTED TARDINESS PROBLEMS(Technical session 6B : Lagrangian decomposition) GENERAL INFORMATION MEETING ROOMS AUTHORS INDEX PARTICIPANTS LIST
Proceedings of International Symposium on Scheduling 2002
刊行2002
インターネットで読める国立国会図書館
目次COVER [OTHERS] Message [OTHERS] CONTENTS 2-T-1 Standardization of APS (Advanced Planning and Scheduling) Problems Recommended by PSLX Consortium Japan 3-T-1 Current SCC Activities and Requests for Schedulers from SCP Systems 2-P-1 Emergent Approach for Scheduling Author index 1-S-1 WHAT MANUFACTURING WANTS FROM SCHEDULING 1-S-2 ARTIFICIAL INTELLIGENCE IN PRODUCTION SCHEDULING : TWO DECADES OF RESEARCH & PROMISES 1-S-3 Sequencing Precedence Related Jobs on Two Machines to Minimize the Weighted Completion Time An Extended Abstract 1-S-4 ECONOMIC LOT SCHEDULING FOR DETERIORATING PRODUCTION SYSTEMS 2-A-1 CONCEPT OF MANAGEMENT SCHEDULER AND A SOFTWARE DEVELOPMENT 2-A-2 THE TIME BREAKTHROUGH STRATEGY FOR SCM 2-A-3 SCHEDULING AS AN INVERSE PROBLEM 2-B-1 IMPROVING PRODUCTION FLEXIBILITY BY MYSAP SCM 2-B-2 B TO B E-COMMERCE SERVER WITH VIRTUAL MARKET FOR GLOBAL SUPPLY CHAIN MANAGEMENT 2-B-3 E-COMMERCE AND BUSINESS MODELS : The Progress of IT (Information Technology) : Its Impact and the Required Business Model 2-S-1 SHELF SPACE ALLOCATION WITH LOCATION EFFECTS ON DEMAND 2-S-2 SPACECRAFT SUPPORT OPTIMIZATION IN REMOTE SENSING TASK SCHEDULING 2-A-4 DETECTING SHIFTING BOTTLENECKS 2-A-5 SINGLE SIMULATION CONFIDENCE INTERVALS USING THE DELTA METHOD 2-A-6 AN OPTIMIZATION-ORIENTED SIMULATION-BASED JOB SHOP SCHEDULING METHOD WITH FOUR PARAMETERS USING PATTERN SEARCH 2-B-4 EVALUATION OF AN AGENT-BASED TRANSPORTATION ROUTE PLANNING METHOD FOR LED FABRICATION LINE USING LAGRANGIAN RELAXATION TECHNIQUE 2-B-5 A HEURISTIC ALGORITHM FOR OPERATING A PERMUTATIONAL CIRCULATION-TYPE VEHICLE ROUTING SYSTEM 2-B-6 PATH OPTIMIZATION IN MULTI-ROBOT CAD/CAM WELDING SYSTEM 2-S-3 ROUTING METHODS IN SCHEDULING TECHNOLOGIES : NEW EXTENSIONS AND APPLICATIONS OF DIJKSTRA'S AND BELLMAN-FORD'S 3-A-1 A STUDY ON INTEGRATED TOOL ALLOCATION AND SCHEDULING IN FLEXIBLE MANUFACTURING SYSTEM WITH TOOL CENTER 3-A-2 MATHEMATICAL MODELING AND HYBRID SOLUTION FOR A CLASS OF FLEXIBLE SHOP SCHEDULING PROBLEMS 3-A-3 FLEXIBLE JOB SHOP SCHEDULING WITH MULTI-LEVEL JOB STRUCTURES 3-B-1 PRACTICAL MULTI-OBJECTIVE SCHEDULING THROUGH SOFT COMPUTING APPROACH 3-B-2 A PATH RELINKING APPROACH FOR THE GENERALIZED ASSIGNMENT PROBLEM 3-B-3 A HYBRID APPROACH FOR THE THREE-DIMENSIONAL BIN PACKING PROBLEM WITH PRACTICAL CONSTRAINTS 3-A-4 A STUDY ON REAL-TIME SCHEDULING FOR HOLONIC MANUFACTURING SYSTEM 3-A-5 FEASIBILITY STUDY OF REAL TIME SCHEDULING USING LAGRANGEAN RELAXATION METHOD UNDER APS ENVIRONMENT 3-A-6 SIMULTANEOUS OPTIMAIZATION OF ALL DECISION FEATURES IN A MULTI-ITEM MULTI-PROCESS DYNAMIC LOT SIZE SCHEDULING PROBLEM 3-A-7 A BATCH SCHEDULING FRAMEWORK FOR CHEMICAL PROCESSES COOPERATED WITH SEQUENTIAL CONTROL SYSTEM 3-B-4 A SCHEDULING METHOD FOR PAINTING LINE UNDER PULL PRODUCTION 3-B-5 LEVELED PRODUCTION IN AUTOMOBILE PARTS PLANT 3-B-6 A PLANNING AND SCHEDULING APPLICATION HAVING INTERMEDIATE CUTTING STOCK AND COMPLEX PULL-TYPE PRODUCTION DEMANDS 3-B-7 APPLYING THE TOC PROJECT MANAGEMENT TO OPERATION AND MAINTENANCE SCHEDULING OF A RESEARCH VESSEL 3-B-8 Introduction of Some Recent Technologies in Solving Realistic Industry Scheduling problems

書誌情報

この資料の詳細や典拠(同じ主題の資料を指すキーワード、著者名)等を確認できます。

デジタル

資料種別
電子書籍・電子雑誌
本文の言語コード
ENG
国立国会図書館永続的識別子
info:ndljp/pid/10356186
コレクション(個別)
国立国会図書館デジタルコレクション > 電子書籍・電子雑誌 > 学術機関 > 学協会
収集根拠
NII-ELS
公開開始日(W3CDTF)
2017-06-22
受理日(W3CDTF)
2017-05-19T11:30:20+09:00
オンライン閲覧公開範囲
インターネット公開