太陽光発電大量導入時における時間断面毎の最適な運転予備力を考慮した揚水発電所最適週間運用計画

Icons representing 記事

太陽光発電大量導入時における時間断面毎の最適な運転予備力を考慮した揚水発電所最適週間運用計画

Call No. (NDL)
Z16-794
Bibliographic ID of National Diet Library
026245072
Material type
記事
Author
相原 良太ほか
Publisher
東京 : 電気学会
Publication date
2015-03
Material Format
Paper
Journal name
電気学会論文誌. B, 電力・エネルギー部門誌 = IEEJ transactions on power and energy 135(3):2015.3
Publication Page
p.141-152
View All

Holdings of Libraries in Japan

This page shows libraries in Japan other than the National Diet Library that hold the material.

Please contact your local library for information on how to use materials or whether it is possible to request materials from the holding libraries.

other

  • CiNii Research

    Search Service
    Digital
    You can check the holdings of institutions and databases with which CiNii Research is linked at the site of CiNii Research.

Bibliographic Record

You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.

Paper Digital

Material Type
記事
Author/Editor
相原 良太
横山 明彦
Alternative Title
Optimal Weekly Operation Scheduling of Pumped Storage Hydro Power Plant Considering Optimal Hot Reserve Capacity in a Power System with a Large Penetration of Photovoltaic Generation
Periodical title
電気学会論文誌. B, 電力・エネルギー部門誌 = IEEJ transactions on power and energy
No. or year of volume/issue
135(3):2015.3
Volume
135
Issue
3
Pages
141-152