コンクリートポンプ工法のブーム作業における先端ホースの長さおよび姿勢がブーム装置の過負荷に及ぼす影響
Digital data available(Japan Link Center)
Begin reading now
CiNii Research
Holdings of Libraries in Japan
This page shows libraries in Japan other than the National Diet Library that hold the material.
Please contact your local library for information on how to use materials or whether it is possible to request materials from the holding libraries.
other
CiNii Research
Search ServiceDigitalYou can check the holdings of institutions and databases with which CiNii Research is linked at the site of CiNii Research.
Bibliographic Record
You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.
- Material Type
- 記事
- Author/Editor
- 中田 善久大塚 秀三岡本 圭市宮田 敦典
- Alternative Title
- INFLUENCE OF LENGTH OF TIP HORSE AND POSTURE ON OVERLOAD OF BOOM DEVICE IN BOOM OPERATION OF PLACING CONCRETE BY PUMPING METHOD
- Periodical title
- 日本建築学会技術報告集 = AIJ journal of technology and design
- No. or year of volume/issue
- 22(52):2016.10
- Volume
- 22
- Issue
- 52
- Pages
- 847-850