駅部大断面トンネルを中壁分割工法で施工--仙台市高速鉄道東西線 青葉山トンネル

Icons representing 記事

駅部大断面トンネルを中壁分割工法で施工--仙台市高速鉄道東西線 青葉山トンネル

Call No. (NDL)
Z16-726
Bibliographic ID of National Diet Library
10792628
Material type
記事
Author
本堂 亮ほか
Publisher
東京 : 土木工学社
Publication date
2009-10
Material Format
Paper
Journal name
トンネルと地下 = Tunnels and underground : 日本トンネル技術協会誌 / 日本トンネル技術協会 [編] 40(10) (通号 470) 2009.10
Publication Page
p.739~747
View All

Holdings of Libraries in Japan

This page shows libraries in Japan other than the National Diet Library that hold the material.

Please contact your local library for information on how to use materials or whether it is possible to request materials from the holding libraries.

other

  • CiNii Research

    Search Service
    You can check the holdings of institutions and databases with which CiNii Research is linked at the site of CiNii Research.

Bibliographic Record

You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.

Paper

Material Type
記事
Author/Editor
本堂 亮
東 優
浅川 敏郎 他
Alternative Title
Construction of large cross-section underground station using the Centre Diaphragm Method: Sendai Subway Tozai Line Aobayama Tunnel
Periodical title
トンネルと地下 = Tunnels and underground : 日本トンネル技術協会誌 / 日本トンネル技術協会 [編]
No. or year of volume/issue
40(10) (通号 470) 2009.10
Volume
40
Issue
10
Sequential issue number
470