Jump to main content
湿式排煙脱硫装置の運...

湿式排煙脱硫装置の運転実績--中国上海電力公司外高橋第1期火力発電所1号機および2号機(300MW×2)

Icons representing 記事

湿式排煙脱硫装置の運転実績--中国上海電力公司外高橋第1期火力発電所1号機および2号機(300MW×2)

Call No. (NDL)
Z14-67
Bibliographic ID of National Diet Library
8790103
Material type
記事
Author
積田 佳満ほか
Publisher
横浜 : 石川島播磨重工業技術開発本部管理部 ; 1961-2007
Publication date
2007-03
Material Format
Digital
Journal name
石川島播磨技報 = Ishikawajima-Harima engineering review 47(1) (通号 269) 2007.3
Publication Page
p.7~15
View All

Holdings of Libraries in Japan

This page shows libraries in Japan other than the National Diet Library that hold the material.

Please contact your local library for information on how to use materials or whether it is possible to request materials from the holding libraries.

other

  • CiNii Research

    Search Service
    Paper
    You can check the holdings of institutions and databases with which CiNii Research is linked at the site of CiNii Research.

Bibliographic Record

You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.

Digital

Material Type
記事
Author/Editor
積田 佳満
戸田 光司
遠藤 巧 他
Alternative Title
Operation results of IHI flue gas desulfurization system: phase 1 units nos. 1 & 2 (300MW each) of Waigaoqiao Thermal Power Station for Shanghai Electric Power
Periodical title
石川島播磨技報 = Ishikawajima-Harima engineering review
No. or year of volume/issue
47(1) (通号 269) 2007.3
Volume
47
Issue
1
Sequential issue number
269