Jump to main content
Volume number2006
6A1 SCHEDU...

6A1 SCHEDULING IN A TWO-MACHINE FLOWSHOP FOR THE MINIMIZATION OF THE SUM OF ABSOLUTE DEVIATIONS FROM A COMMON DUE DATE(Technical session 6A: Machine and shop scheduling 1)

Icons representing 記事
The cover of this title could differ from library to library. Link to Help Page

6A1 SCHEDULING IN A TWO-MACHINE FLOWSHOP FOR THE MINIMIZATION OF THE SUM OF ABSOLUTE DEVIATIONS FROM A COMMON DUE DATE(Technical session 6A: Machine and shop scheduling 1)

Persistent ID (NDL)
info:ndljp/pid/10354518
Material type
記事
Author
Sakuraba,Satoshiほか
Publisher
日本機械学会
Publication date
2006-07-18
Material Format
Digital
Journal name
Proceedings of International Symposium on Scheduling 2006
Publication Page
p.144-147
View All

Notes on use

Note (General):

著者所属: Department of Production Engineering University of Sao Pauloレポート・講演番号: 6A1

Detailed bibliographic record

Summary, etc.:

This paper addresses the minimization of the sum of absolute deviations (SAD) from a common due date in a two-machine flowshop scheduling problem. We ...

Bibliographic Record

You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.

Digital

Material Type
記事
Title Transcription
6A1 SCHEDULING IN A TWO-MACHINE FLOWSHOP FOR THE MINIMIZATION OF THE SUM OF ABSOLUTE DEVIATIONS FROM A COMMON DUE DATE(Technical session 6A: Machine and shop scheduling 1)
Author/Editor
Sakuraba,Satoshi
Ronconi,Debora P.
Publication, Distribution, etc.
Publication Date
2006-07-18
Publication Date (W3CDTF)
2006-07-18
Periodical title
Proceedings of International Symposium on Scheduling
No. or year of volume/issue
2006
Volume
2006