トンネル覆工コンクリートの背面空洞充填工法の施工管理方法に関する検討
Available in National Diet Library
Find on the publisher's website
NDL Digital Collections
Digital data available(東急建設)
Bibliographic Record
You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.
- Material Type
- 記事
- Author/Editor
- 前原聡鈴木将充佐藤務
- Publication, Distribution, etc.
- Publication Date
- 2018
- Publication Date (W3CDTF)
- 2018
- Alternative Title
- A study on the implementation of the tunnel back cavity filling method
- Periodical title
- 東急建設技術研究所報
- No. or year of volume/issue
- (44)
- Volume
- (44)