中国電力株式会社水島火力発電所納第一号機125,000kW発電設備性能試験結果について
Read via the Internet
Begin reading now
NDL Digital Collections
Bibliographic Record
You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.
- Material Type
- 記事
- Author/Editor
- 中井英雄綿森力杉沼八郎
- Publication, Distribution, etc.
- Publication Date
- 1962-12-25
- Publication Date (W3CDTF)
- 1962-12-25
- Alternative Title
- Performance tests of 125,000 kW generating units installed at Mizushima Power Station of Chugoku Electric Power Co., Inc.
- Periodical title
- 日立評論
- No. or year of volume/issue
- 44(12)
- Volume
- 44(12)