最新鋭高効率コンバインドプラントの設計と試運転実績 : 東北電力(株)東新潟火力発電所第4-1号系列の建設
Read via the Internet
Begin reading now
NDL Digital Collections
Bibliographic Record
You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.
- Material Type
- 記事
- Author/Editor
- 塚越敬三吉田斎臣高橋進
- Publication, Distribution, etc.
- Publication Date
- 2000-01
- Publication Date (W3CDTF)
- 2000-01
- Extent
- 容量 : 371002.pdf(347506bytes)
- Alternative Title
- Design and operation experience of latest advanced combined cycle plant : construction of Unit No.4-1 Higashi Niigata Thermal Power Station of Tohoku Electric Power Co., Inc.
- Periodical title
- 三菱重工技報
- No. or year of volume/issue
- 37(1)