特集論文 1500℃級ガスタービンコンバインドプラントによる高効率化 : 関西電力(株)堺港発電所設備更新工事
Read via the Internet
Begin reading now
NDL Digital Collections
Bibliographic Record
You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.
- Material Type
- 記事
- Author/Editor
- 松田秀雄内田勝徳
- Publication, Distribution, etc.
- Publication Date
- 2010
- Publication Date (W3CDTF)
- 2010
- Extent
- 容量 : 471021.pdf(852434bytes)
- Alternative Title
- Renewal to high efficiency GTCC power plant with gas turbine inlet temperature of 1500℃ : Sakaikou Power Station of The Kansai Electric Power Co., Inc.
- Periodical title
- 三菱重工技報
- No. or year of volume/issue
- 47(1)