既設トンネル直下へ超長尺大口径鋼管先受け工を坑内から初適用
Available in National Diet Library
Find on the publisher's website
NDL Digital Collections
Digital data available(西松建設)
Bibliographic Record
You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.
- Material Type
- 記事
- Author/Editor
- 吉平安生吉田正樹山下雅之
- Publication, Distribution, etc.
- Publication Date
- 2016
- Publication Date (W3CDTF)
- 2016
- Alternative Title
- Application of Long distance and Large caliber Forepiling method “LL-Fp method” to the inside section of tunnel under the existing water tunnel
- Periodical title
- 西松建設技報
- No. or year of volume/issue
- (39)
- Volume
- (39)