湿式排煙脱硫装置の運転実績 : 中国上海電力公司外高橋第1期火力発電所1号機および2号機(300MW×2)
Read via the Internet
Begin reading now
NDL Digital Collections
Bibliographic Record
You can check the details of this material, its authority (keywords that refer to materials on the same subject, author's name, etc.), etc.
- Material Type
- 記事
- Author/Editor
- 積田佳満戸田光司遠藤巧
- Publication, Distribution, etc.
- Publication Date
- 2007-03
- Publication Date (W3CDTF)
- 2007-03
- Alternative Title
- Operation results of IHI flue gas desulfurization system : phase 1 units Nos. 1 & 2 (300 MW each) of Waigaoqiao thermal power station for Shanghai Electric Power
- Periodical title
- 石川島播磨技報
- No. or year of volume/issue
- 47(1)
- Volume
- 47(1)